CUFFLEY SCHOOL

 

Commissioned by Cuffley School, the classroom and music studios provide over 800sq ft of valuable extra space, linked to the existing building by a covered walkway.

Located on the outskirts of North London, the building was craned in in just one day during half term to minimise disruption, and was painted in striking green and orange to reflect the vibrant and creative nature of their use.

Key Facts

Client: Cuffley School

Completion date: 2008

Uses: Classroom and music studios

Installation time: 1 day

Total space created: 75 m2

Location: Cuffley, Herts, EN3

Design / Build: Container City™

Engineer: Furness Engineering

Units created: 3